St. Bernard Parish, southeast of New Orleans, was one of the areas hit hardest when Hurricane Katrina鈥檚 23-foot storm surge breached the city鈥檚 levees in 2005. About 85 percent of the parish lay under water. In the aftermath of Katrina, 色控传媒 played a key role in executing the U.S. Army Corps of Engineers鈥 (USACE) $14.2 billion plan to protect New Orleans from future storms.
In addition to providing immediate post-disaster cleanup and restoration support to USACE on more than 30 projects, we provided constructability reviews and construction services to upgrade the levee section known as Lake Pontchartrain and Vicinity (LPV) 146, located in St. Bernard Parish.
At LPV 146, the AECOM-led team placed more than 100,000 cubic yards of concrete to build approximately eight miles of flood control wall, or 鈥淭-wall,鈥 atop the existing levee. Raising聽the protective barrier from an approximate elevation of 20 feet to 29 feet greatly reduced the area鈥檚 vulnerability to potential storm surges.
LPV 146 was a large-scale, highly complex undertaking. The three phases of the $273 million project entailed constructability reviews, which included initial scheduling and cost estimating; plan validation, which required driving of test piles; and finally construction.
As a validation of the quality of 色控传媒鈥檚 work, LPV 146 protected St. Bernard Parish when Hurricane Isaac swept through the area in 2012.
PROJECT HIGHLIGHTS
- Completed entire project without a lost-time accident
- Reduced project timeline by 42 days and produced $50 million in net project savings
- Awarded the highest profit rate allowable under a USACE contract鈥10 percent
- Earned USACE鈥檚 highest performance rating